Schematic and single-line diagrams should be arranged so that signal or transmission path from input to output proceeds in this fashion:
A. Right to left and top to bottom
B. Right to left and bottom to top
C. Left to right and top to bottom
D. Left to right and bottom to top
What is the correct answer?
4
In this type of dimensioning, allowance must be made for bends:
What is the correct answer?
4
Oblique drawings are dimensioned in a similar fashion as these types of drawings:
What is the correct answer?
4
A projection weld is a type of:
What is the correct answer?
4
5.These items typically are not used in new designs, but are still common in high-power amplifiers:
What is the correct answer?
4
The distance a screw thread advances axially in one turn is the:
What is the correct answer?
4
The standard number of threads per inch for various diameters is the:
What is the correct answer?
4
One critical issue drafters need to pay close attention to is the ________.
What is the correct answer?
4
An accurate record of changes made to release drawings is tracked via this:
What is the correct answer?
4
When using the direct entry method to create a horizontal line exactly three inches long the drafter should ________ first.
A. Pull the line from away from the starting point very carefully
B. Insure that Ortho is on
C. Enter 3 for the length of the line
D. Read the coordinate position on the Dynamic Readout
What is the correct answer?
4
In isometric projection, all distances are approximately this percentage of their true size:
What is the correct answer?
4
This type of solid is formed by sweeping a shape along a linear path:
What is the correct answer?
4
A half-moon protractor is divided into how many degrees?
What is the correct answer?
4
In oblique sketches, the most commonly used angles for receding lines are:
What is the correct answer?
4
These are joined together in the field to build a structure:
D. Assembled fabrications
What is the correct answer?
4
In architectural drawing ________ are often used to illustrate and detail structural components.
A. Foundation beam detail sections
What is the correct answer?
4
Most architectural drawings produced for field use by building contractors are printed on architectural D size paper which measures ________.
What is the correct answer?
4
These weld symbols have no arrow-side or other-side significance:
A. Projection or seam weld
C. Surface or groove weld
What is the correct answer?
4
In an exploded assembly drawing it is customary for the drafter to use a ________ line to illustrate how parts fit together.
What is the correct answer?
4
Architectural drafters generally prefer to use ________ drawings to help illustrate 3-dimensional views of a structure.
What is the correct answer?
4
The MASSPROP shortcut will provide the following information.
What is the correct answer?
4
If a designer is developing a plan for a project in which the entire part is made out of ¾ thick plywood and he only wants to use one view, he should use the ________ view.
What is the correct answer?
4
This is a conical-shaped recess around a hole, often used to receive a tapered screw head:
What is the correct answer?
4
The View toolbar will position the view of the 3-D solid toward the ________.
What is the correct answer?
4
The principle views associated with orthographic projection are ________.
What is the correct answer?
4
Geometric primitives include shapes such as ________.
What is the correct answer?
4
These are lines drawn on a map to locate, in the plan view, points of equal ground elevation:
What is the correct answer?
4
The Conceptual Visual Style tool is located on the ________ toolbar.
What is the correct answer?
4
Circular shapes appear in this fashion when viewed at an angle other than 90 degrees:
What is the correct answer?
4
This type of weld is the most common in structural steel fabrication: