Comparison of profit and loss
Comparison of assets and liabilities
Change in output due to change in input
Economics of cost and benefits of the project
C. Change in output due to change in input
The activity is the time consuming part of a project
The beginning and end of a job, are called events
The activity which consumes maximum time, is called a node
Logically and sequentially connected activities and events form a network
Change of critical path
Decrease of project completion time
Increase of project completion time
All of the above
Is always longest
Is always shortest
May be longest
May be shortest
Ice
Concrete
Loose sand
Earth
Resources
Project duration time
Both resources and project duration time
None of the above
19
14
24
None of these
Trimming and finishing
Shaping and trimming
Finishing and shaping
Finishing, shaping and trimming
Synthesising in concepts
Is built of activities oriented programme
Is based on time estimate
All the above
Effective command and control
Rigid discipline in the organisation
Defined responsibilities at all levels
All the above
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
All the above
Event
Dummy
Duration
Float
Unity of command
Effective control at all levels
Delegation of authority
All the above
Comparison of profit and loss
Comparison of assets and liabilities
Change in output due to change in input
Economics of cost and benefits of the project
LST-EST
LFT-EFT
TL-EFT
All the above
Strict adherence to specifications
Separation of planning and design part
Each individual maintains functional efficiency
All the above
Rs. 8,800
Rs. 7,600
Rs. 6,400
Rs. 5,000
An engineer
An architect
An owner
All the above
Site survey
Availability of construction materials
Availability of labour
All the above
30 kg
300 kg
900 kg
1000 kg
1-2 is 4
2-3 is 7
3-4 is 8
All the above
Emphasis is given to activities
Uncertainties are not allowed
Activities are represented by arrows
All the above
The various functions under each activity, are shown by one bar on Bar Charts
Bar chart establishes the interdependency of one event on another
Only approximate percentage of the completed work is reported
None of these
Decreasing the direct cost and increasing indirect cost
Increasing the direct cost and decreasing the indirect cost
Increasing the direct cost and indirect cost both
Decreasing the direct cost and indirect cost both
Its latest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest start time and earliest finish time
Its earliest finish time and earliest start time for its successor activity
Most likely time
Optimistic time
Pessimistic time
Expected time
Planning
Designing
Execution
All the above
1
2
3
4
Light construction
Heavy construction
Industrial construction
Private construction
Rs. 4,75,000
Rs. 5,75,000
Rs. 6,50,000
Rs. 8,50,000
Bulldozer
Clam shell
Scraper
Dump truck