Home
Current Affairs January 2024

What is the correct answer?

4

These are lines drawn on a map to locate, in the plan view, points of equal ground elevation:

A. Contours

B. Elevations

C. Profiles

D. Hatches

Correct Answer :

A. Contours


Related Questions

What is the correct answer?

4

Isometric drawings are often used by ________ to help illustrate complex designs.

A. Mechanical engineers

B. Piping drafters

C. Aerospace engineers

D. All of the above

What is the correct answer?

4

This type of drawing shows two lines representing the pipe diameter:

A. Single-line

B. Double-line

C. Standard piping

D. Centerline piping

What is the correct answer?

4

Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________.

A. Change order

B. Modification slip

C. Whole new set of drawings

D. None of the above

What is the correct answer?

4

5.These items typically are not used in new designs, but are still common in high-power amplifiers:

A. Amplifier tubes

B. Electron tubes

C. Signal relays

D. Switches

What is the correct answer?

4

If a designer is developing a plan for a project in which the entire part is made out of ¾ thick plywood and he only wants to use one view, he should use the ________ view.

A. Front

B. Top

C. Right

D. Back

What is the correct answer?

4

In working drawings, these show all necessary information not given directly on the drawing with its dimensions and notes:

A. Document strips

B. Portable documents

C. Formatting forms

D. Title and record strips

What is the correct answer?

4

This is how axonometric, oblique, and perspective sketches show objects:

A. Orthographically

B. Pictorially

C. Obliquely

D. Parallel

What is the correct answer?

4

These breaks are used to shorten the view of an object:

A. Section breaks

B. Aligned breaks

C. Conventional breaks

D. Full breaks

What is the correct answer?

4

How can the drafter prevent Auto-CAD from placing or stacking another center mark on a circle when adding a diameter dimension to it?

A. Explode the dimension and then erase the center mark

B. Use the Properties dialog box to turn off the center mark of the dimension

C. It can't be done

D. Use the trim tool to take away the stacked center mark

What is the correct answer?

4

The title block used on working drawings should include the __________.

A. Sheet number

B. Line type

C. Layer set

D. All of the above

What is the correct answer?

4

This is the theoretically exact size from which limits of size are determined:

A. Actual Size

B. Dimensioned size

C. Production size

D. Basic size

What is the correct answer?

4

The primary unit of measurement for engineering drawings and design in the mechanical industries is the:

A. Millimeter

B. Centimeter

C. Meter

D. Kilometer

What is the correct answer?

4

These maps are used to plan construction projects that locate construction features so they fit the topography of the area:

A. Subdivision plats

B. Landscape maps

C. Structural topography maps

D. Structure location plans

What is the correct answer?

4

The bounding box method for setting up an isometric drawing helps the drafter ________.

A. Confine the isometric drawing to its maximum size

B. Figure what lines are to be illustrated vertical and horizontal

C. Position the isometric drawing in paper space

D. None of the above

What is the correct answer?

4

Oblique drawings are dimensioned in a similar fashion as these types of drawings:

A. Orthographic

B. Isometric

C. Angular

D. Parallel

What is the correct answer?

4

Baseline dimensions are referenced from a common geometric feature known as a ________.

A. Edge

B. Corner

C. Datum

D. Point of reference

What is the correct answer?

4

A ________ section allows the drafter to create a Cutting Plane line which is not in a straight line across the part.

A. Offset

B. Half

C. Whole

D. Broken out

What is the correct answer?

4

When creating a Cutting Plane line with Auto-CAD it is customary to use a ________ to create the line.

A. Center line

B. Polyline

C. Dashed line

D. Hatch line

What is the correct answer?

4

The ________ is a standard element of a section view in a technical drawing.

A. Cutting Plane line

B. Section lines

C. Material hatch pattern

D. All of the above

What is the correct answer?

4

Most architectural drawings produced for field use by building contractors are printed on architectural D size paper which measures ________.

A. 24 × 36

B. 18 × 24

C. 11 × 17

D. 34 × 22

What is the correct answer?

4

This type of projection is when projectors are parallel to each other, but is at an angle other than 90 degrees to the plane of projection:

A. Oblique projection

B. Perpendicular projection

C. Aesthetic projection

D. Angular projection

What is the correct answer?

4

In oblique sketches, the most commonly used angles for receding lines are:

A. 15 or 30 degrees

B. 25 or 30 degrees

C. 30 or 45 degrees

D. 45 or 60 degrees

What is the correct answer?

4

The most common geometric form used in gears today is this:

A. Involute profile

B. Convolute profile

C. Base circle

D. Spur circle

What is the correct answer?

4

In this type of concrete, the steel is pre-tensioned before the superimposed load is applied:

A. Aggregate

B. Pre-stressed

C. Reinforced

D. Preloaded

What is the correct answer?

4

This is the term for the range of tightness or looseness resulting from the allowances and tolerances in mating parts:

A. Limits

B. Fit

C. Specifications

D. Allowance

What is the correct answer?

4

This type of rapid prototyping system uses a laser to fuse powdered metals, plastics, or ceramics:

A. Fused deposition modeling

B. Stereo lithography apparatus

C. Solid ground curing

D. Selective laser sintering

What is the correct answer?

4

CAD programs which incorporate parametric modeling utilize a system in which the dimensions control the ________.

A. Size and shape of the model features

B. Perspective of the model

C. Shading used to render the model

D. All of the above

What is the correct answer?

4

The foundation contractor will work with the following architectural plans.

A. Foundation

B. Site plan

C. Floor plan

D. All of the above

What is the correct answer?

4

Spur gear design normally begins with selecting this:

A. Rack size

B. Tooth size

C. Gear size

D. Pitch diameter

What is the correct answer?

4

The MASSPROP shortcut will provide the following information.

A. Mass

B. Volume

C. Bounding box

D. All of the above