The term 'value' in value engineering refers to

A. Total cost of the product

B. Selling price of the product

C. Utility of the product

D. Manufactured cost of the product

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. Works cost implies
  2. The probability distribution of project completion in PERT follows following distribution
  3. The basic difference between PERT and CPM is that
  4. A-B-C analysis
  5. One of the basic essentials of an incentive plan is that
  6. In value engineering, important consideration is given to
  7. Gantt charts are used for
  8. Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it
  9. Gantt charts provide information about
  10. According to MAPI formula, the old machine should be replaced by new one when (CAM = Challenger's Adverse…
  11. Graphical method, simplex method, and transportation method are concerned with
  12. Which of the following depreciation system ensures that the interest be charged on the cost of machine…
  13. Emergency rush order can be pushed more effectively in
  14. Critical path moves along the activities having total float of
  15. In a line organisation
  16. If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start…
  17. Acceptance sampling is used in
  18. Pessimistic time is
  19. The deductions for, employees provident fund start
  20. Which of the following charts are used for plant layout design?
  21. The linear programming techniques can be applied successfully to industries like
  22. The main objective of work measurement is to
  23. Replacement studies are made on the following basis:
  24. Routing
  25. PERT and CPM are
  26. PERT is
  27. The main object of scientific layout is
  28. ABC analysis deals with
  29. One time measurement unit (TMU) in method time measurement system equals
  30. A feasible solution to the linear programming problem should