Home

String diagram is used when

A. Team of workers is working at a place

B. Material handling is to be done

C. Idle time is to be reduced

D. All of the above

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. Which of the following depreciation system ensures that the interest be charged on the cost of machine…
  2. The critical path of a network represents
  3. Direct expenses include
  4. M.T.M. is used to
  5. Material handling and plant location is analysed by
  6. Material handling in automobile industry is done by
  7. A low unit cost can be obtained by following
  8. PERT/CPM, techniques can be used for following applications
  9. PERT
  10. Work study involves
  11. The correct sequence of phases in value engineering is
  12. The term 'value' in value engineering refers to
  13. Which one of the following represents a group incentive plan?
  14. Choose the wrong statement Time study is used to
  15. Which of the following type of layout is suitable for automobile manufacturing concern?
  16. Work study is done with the help of
  17. Which of the following statement is correct?
  18. Which one of the following represents a group incentive plan?
  19. Routing assists engineers in deciding in advance
  20. In manufacturing management, the term 'Dispatching' is used to describe
  21. The bonus increases in proportion to the increase in efficiency. This statement applies to
  22. PERT has following time estimate
  23. Activity slack or float of any event on a PERT/CPM chart is represented by
  24. A dummy activity
  25. Which of the following layouts is suited to job production?
  26. The unit cost in case of batch production is ________ as compared to jobbing production.
  27. In steel plant the most important system for materials handling is
  28. Linear programming can be applied successfully to
  29. Breakeven analysis consists of
  30. The time which results in the least possible direct cost of an activity is known as