Keep all the handling to the minimum
Select only efficient handling equipment
Move the heaviest weight to the least distance
All of the above
D. All of the above
The most economical level of operation of any industry
The time when unit can run without i loss and profit
Time when industry will undergo loss
The time when company can make maximum profits
300
460
500
1000
Job production
Batch production
Mass production
Any one of these
It represents a situation where extra resources are available and the completion of project is not delayed
It represents that a programme falls behind schedule and additional resources are required to complete the project in time
The activity is critical and any delay in its performance will delay the completion of whole project
Any one of the above
The average service rate Hess than the average arrival rate
Output rate is linearly proportional to input
Output rate is constant and the input varies in a random manner
All of the above
Minor works
Major works
Large projects
All of the above
Gantt chart
Bin chart
Emerson chart
Travel chart
Handling and backtracking of materials is too much
Production control is more difficult and costly
Routing and scheduling is more difficult
All of the above
Graph paper
Process chart
Planning chart
Stop watch
Process chart
Machine load chart
Man-machine chart
Gantt chart
Line organisation
Functional organisation
Line and staff organisation
Line, staff and functional organisation
An event can't be accomplished until activities leading to it are completed
No activity from any event can be started from preceding event till it is completed
Length of arrow has nothing to do with time
All of the above
Sinking fund method
Straight line method
ABC charging method
Annuity charging method
Work sampling
Time study
Method study
Work study
Batch production
Continuous type of product
Effective utilisation of machines
All of the above
To concentrate his attention on critical activities
To divert the resources from noncritical advanced activities to critical activities
To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
All of the above
Same
Low
High
None of these
Chemical industry
Oil industry
Banks
All of these
A
B
C
None of these
Scanlon Plan
Rowan Plan
Taylor Differential Piece Rate System
Halsey Premium Plan
Top level executives have to do excessive work
Structure is rigid
Communication delays occur
All of the above
Value analysis
Operation research
Linear programming
Model analysis
To produce better quality of product
To utilise maximum floor area
To minimise production delays
All of these
Increases continuously
Decreases continuously
Remain constant
May increase or decrease depending on various factors
Quality
Statistics
Probability
All of the above
Hoist
Jib crane
Portable elevator
Chain conveyor
Shows the inter dependences of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of the above
Organisation performance × motivation = profits
Knowledge × skill = ability
Ability × motivation = performance
Attitude × situation = motivation
Loads are uniform
Routes do not vary
Materials move relatively continuously
All of these
When work should start and how much work should be completed during a certain period
When work should complete
That how idle time can be minimized
Proper utilisation of machines