Standard time is equal to

A. (Normal time) - (allowances)

B. (Normal time) + (allowances)

C. Representative time multiplied by rating factor

D. Normal time taken by an operation

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. PERT is
  2. Fixed position layout is also known as
  3. In process layout
  4. The mathematical technique for finding the best use of limited resources in an optimum manner is known…
  5. For ship vessel industry the following layout is best suited
  6. CPM stands for
  7. In Lincoln plan (one type of group incentive plan), the amount of the profit which an employee receives…
  8. A dummy activity in a net work diagram
  9. CPM is the
  10. The time of completing a project in network analysis is given by following time of the critical activity…
  11. Which of the following statement is wrong?
  12. Pessimistic time is
  13. Linear programming can be applied successfully to
  14. Bar charts are suitable for
  15. Choose the wrong statement Time study is used to
  16. The main advantage of line organisation is its
  17. The correct sequence of phases in value engineering is
  18. The appellate authority for an industrial dispute is
  19. Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it
  20. The main disadvantage of line organisation is
  21. For material transportation, conveyors are used when the prevailing conditions include
  22. Activity slack or float of any event on a PERT/CPM chart is represented by
  23. Under the Apprenticeship Act
  24. The salient feature of functional organisation is
  25. Basic tool in work study is
  26. The first method invented for planning projects was
  27. The work study is done by means of
  28. An activity of the project is graphically represented by ________ on the network diagram.
  29. Micro-motion study is
  30. A feasible solution to the linear programming problem should