Monte Carlo solutions in queuing theory are extremely useful in queuing problems

A. That can't be analysed mathematically

B. Involving multistage queuing

C. To verify mathematical results

D. All of the above

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual…
  2. The assumption in PERT is
  3. The factors to be considered for production scheduling are
  4. Process layout is also known as
  5. M.T.M. is used to
  6. If A is the total items consumed per year, P is the procurement cost per order, and C is the annual…
  7. The unit cost in case of batch production is ________ as compared to jobbing production.
  8. Micro-motion study is
  9. Which one of the following represents a group incentive plan?
  10. When slack of an activity is positive
  11. PERT
  12. In the cost structure of a product, the selling price is determined by the factors such as
  13. Military organisation is known as
  14. Critical Path Net Work helps an engineer
  15. The linear programming techniques can be applied successfully to industries like
  16. Which of the following layouts is suited to job production?
  17. Critical path moves along the activities having total float of
  18. Micro-motion study is
  19. In A-B-C analysis, which class of items are generally large in number?
  20. A feasible solution to the linear programming problem should
  21. The type of organisation preferred for a steel industry, is
  22. Percent idle time for men or machines is found by
  23. Breakeven analysis is a
  24. Pick up the correct statement from the following
  25. Halsey plan of wage incentive
  26. Time study is carried out
  27. The basic difference between PERT and CPM is that
  28. Service time in queuing theory is usually assumed to follow
  29. The salient feature of functional organisation is
  30. Basic tool in work study is