Produces a definite volume of work per minute
Perform definite number of operations
Produce job at a definite spectrum of speed
Holds a definite spectrum of tolerance and surface finish
A. Produces a definite volume of work per minute
Total work content
Base time + relaxation time
Total work content + basic time
Total work content + delay contingency allowance
Operation
Inspection
Delay/ temporary Storage
Permanent storage
Fixed expenses
Variable cost
Sales revenue
All of these
Optimistic time
Pessimistic time
Most likely time
All of these
Is represented by a dotted line
Is an artificial activity
Does not consume time or resources
All of these
Delphi
Brain storming
Morphological analysis
Direct expert comparison
Material handling
Proper utilisation of manpower
Production schedule
Efficient working of machine
Inspection
Transport
Delay/temporary storage
Permanent storage
Process layout
Product layout
Fixed position layout
Plant layout
Productivity
Inventory control
Production planning
Production control
Line organisation
Line and staff organisation
Functional organisation
Effective organisation
Process layout
Product layout
Fixed position layout
Plant layout
Job enlargement
Job enrichment
Job rotation
Job evaluation
It represents a situation where extra resources are available and the completion of project is not delayed
It represents that a programme falls behind schedule and additional resources are required to complete the project in time
The activity is critical and any delay in its performance will delay the completion of whole project
All of the above
Optimistic time
Pessimistic time
Most likely time
All of these
Is artificially introduced
Is represented by a dotted line
Does not require any time
All of the above
CAM < DAM
CAM > DAM
CAM = DAM
There is no such criterion
Improve existing methods
Establish time standards
Develop effective methods in advance of the beginning of production
All of the above
Lowers overall manufacturing time
Requires less space for placing machines
Utilises machine and labour better
All of these
Analytical layout
Synthetic layout
Static product layout
None of these
Normal
Binomial
Exponential
Gaussian
0.50
0.66
0.84
0.95
Belt conveyor
Bucket conveyor
Fork lift truck
Overhead crane
Purchase value
Saleable value
Depreciated value
Function/cost
Detailed calculations
Convenience
Table of random numbers
Past experience
Free float = total float
Independent float = total float
Independent float > free float
Independent float < free float
Effective command and control
Defined responsibilities at all levels
Rigid discipline in the organisation
All of the above
By finding all the significant informations regarding the job, work place and machine tool etc.
By breaking up each operation into small elements which are measurable with the help of the measuring device accurately
By observing and recording the time taken by the operator for an operation
All of the above
Crash cost/Normal Cost
(Crash Cost - Normal cost)/ (Normal time - Crash time)
Normal Cost/Crash cost
(Normal cost - Crash cost)/ (Normal time - Crash time)
Overall simplification, safety of integration
Economy in space
Maximum travel time in plant
To provide conveniently located shops