Achieving optimisation
Ensuring against market fluctuations
Acceptable customer service at low capital investment in inventory
Discounts allowed in bulk purchase
C. Acceptable customer service at low capital investment in inventory
An event
An activity
A duration
None of these
Quality of work is better
Wastage of material is minimum
Specialised knowledge and guidance to individual worker is provided
All of the above
Techniques to determine project status
Decision making techniques
Charts which increase aesthetic appearance of rooms
Aids to the decision maker
One time estimate
Two time estimate
Three time estimate
Four time estimate
Relations between factors must be linear (positive)
Relations between factors must be linear (negative)
Either (A) or (B)
Only one factor should change at a time, others remaining constant
Overall simplification, safety of integration
Economy in space
Maximum travel time in plant
To provide conveniently located shops
Product layout
Process layout
Fixed position layout
Any one of these
Belt conveyor
Bucket conveyor
Fork lift truck
Overhead crane
PERT deals with events and CPM with activities
Critical path is determined in PERT only
Costs are considered on CPM only and not in PERT
Guessed times are used in PERT and evaluated times in CPM
Graph paper
Process chart
Planning chart
Stop watch
Inventory control
Material handling
Production schedule
Machine repair schedules
Is artificially introduced
Is represented by a dotted line
Does not require any time
All of the above
F.W. Taylor
H.L. Gantt
F.B. Gilbert
R.M. Barnes
Productivity
Inventory control
Production planning
Production control
Increases continuously
Decreases continuously
Remain constant
May increase or decrease depending on various factors
Where production activities are involved
In judging the rating of machines
In improving industrial relations
In judging the output of a man and improving it
Fixed cost
Variable cost
Fixed cost + variable cost
Fixed cost + variable cost + overheads
Process layout
Product layout
Fixed position layout
Plant layout
Marketing programmes and advertising programmes
Installation of machinery
Research and development of products
All of these
EF = ES + D
LS = LFD
LF = LS + D
All of the above
Product layout
Process layout
Group layout
Static layout
Keep all the handling to the minimum
Select only efficient handling equipment
Move the heaviest weight to the least distance
All of the above
Operation research
Linear programming
Network analysis
Breakeven analysis
Dummy
Event
Activity
Contract
Material handling
Proper utilisation of manpower
Production schedule
Efficient working of machine
Material handling operation
Maintenance operation
Packing and shipping operation
All of these
Stop watch time study
Analysis of micro-motions
Grouping timing technique
Analysis of standard data system
Is a basic technique of materials management
Is meant for relative inventory control
Does not depend upon the unit cost of the item but on its annual consumption
All of the above
Single time estimate
Double time estimate
Triple time estimate
None of these
Material handling
Reducing the waiting time or idle time
Better utilization of man services
Effective use of machines