PERT stands for

A. Programme Estimation and Reporting Technique

B. Process Estimation and Review Technique

C. Programme Evaluation and Review Technique

D. Planning Estimation and Resulting Technique

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. Work study is most useful
  2. The artificial activity, which indicates that an activity following it cannot be started unless, the…
  3. CPM requires
  4. Product layout is used for
  5. Indirect expenses include
  6. Works cost implies
  7. A-B-C analysis is used in
  8. A dummy activity
  9. For a product layout the material handling equipment must
  10. Pick up the incorrect statement from the following
  11. In time study, the rating factor is applied to determine
  12. If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start…
  13. The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees…
  14. Standard time is equal to
  15. In the cost structure of a product, the selling price is determined by the factors such as
  16. F. W. Taylor introduced a system of organisation known as
  17. According to Rowan plan of wage incentive system, bonus is paid to a worker
  18. CPM is the
  19. Time study is used to
  20. Gantt chart provides information about the
  21. The determination of standard time in a complex job system is best done through
  22. PMTP (predetermined motion time systems) include
  23. The amount deducted from the salary of workers towards employees provident fund is
  24. Product layout is employed for
  25. Travel charts are used to
  26. The performance of a specific task in CPM is known as
  27. O on a PERT/CPM chart represents
  28. The objective of time study is to determine the time required to complete a job by
  29. The wastage of material in the store is taken into account by the following method in the evaluation…
  30. Critical path moves along the activities having total float of